Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-08-31 07:07
167
Company Profile
By certification [File Integrity]
Contact: xhypoweradapter(Mr.)
Email:
Telephone:
Area: Beijing
address: 2F/B5 Fumin Industrial Zone Tangwei, Fuyong Town, Baoan District, Shenzhen, Guangdong, China (518000)
Formwork Wall- through Bolt
unit price:Negotiable
Formwork Pin and Clip set
unit price:Negotiable
Pipe and Coupler Shoring
unit price:Negotiable
Steel Waling system
unit price:Negotiable
Formwork Tie Rod
unit price:Negotiable
Hook Square Pipe Connection Waler Clamp
unit price:Negotiable
| Function | |
| Energy efficiency: | Ⅴ/VI |
| Line regulation (Full Load): | ≤5% |
| Load regulation: | ≤5% |
| Ripple and noise: | ≤100mV |
| Hold-up time: | 20ms (220V AC, typical) |
| Rise time: | 50ms full load (typical) |
| Temperature coefficient: | |
| Output voltage adjust range: | ±10% (main path) |
| Output overload protection: | 105-250% shut down and restart |
| Output overvoltage protection: | 115-150% shut down and restart |
| Withstand voltage: | Input-output 3kV AC/minute, input-outside case 3kV AC/minute |
| Insulation resistance : | ≥100MΩ (500V DC) |
| Operation temperature: | 0-45°C |