Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-10-19 15:02
217
Company Profile
By certification [File Integrity]
Contact: highlingdredger(Ms.)
Email:
Telephone:
Area: Beijing
address: No. 01599, Xiangjiang West Street, Advanced Manufactur Industrial Park, Binhai Economy Development Zone, Weifang, Shandong, China (261108)
Formwork Wall- through Bolt
unit price:Negotiable
Formwork Pin and Clip set
unit price:Negotiable
Pipe and Coupler Shoring
unit price:Negotiable
Steel Waling system
unit price:Negotiable
Formwork Tie Rod
unit price:Negotiable
Hook Square Pipe Connection Waler Clamp
unit price:Negotiable
| HL250 | |
| Dredger LOA | 23.0m |
| Hull size | (L) 16.0 x (B) 6.2 x (H) 2.0m |
| Main pontoon | (L) 11.6 x (B) 2.2 x (H) 2.0m |
| Side pontoon | (L) 14.0 x (B) 2.0 x (H) 2.0m |
| Main engine brand and power | Cummins/298kW |
| Auxiliary engine brand and power | |
| Harbor generator | 20GF/Cummins |
| Dredging pump | warman technology |
| Discharge pipe inner diameter | 250mm |
| Head | 30m |
| Max dredging depth | 9m |
| Waterflow | 1000m3/H |
| Solid sand capacity | 200m3/H |
| Discharge distance | 1000m |
| Cutter head diameter | 1300mm |
| Cutter power | 50kW |
| Draught | 1.2m |
| Displacement | 120T |
| Total weight | 60T |
| Totalpower | 318kW |
| Total fuel oil consumption | 45L/H |