Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-08-28 03:45
213
Company Profile
By certification [File Integrity]
Contact: highlingdredger(Ms.)
Email:
Telephone:
Area: Beijing
address: No. 01599, Xiangjiang West Street, Advanced Manufactur Industrial Park, Binhai Economy Development Zone, Weifang, Shandong, China (261108)
Floral Pattern Rigid Watch Gift Box
unit price:Negotiable
Gold Polka Dot Paper Watch Gift Box
unit price:Negotiable
Vintage Fairy Tale Foldable Gift Box
unit price:Negotiable
Blue Striped Magnetic Foldable Apparel Gift Box
unit price:Negotiable
Printed Foldable Apparel Gift Box
unit price:Negotiable
Pink Heart Window Foldable Cake Gift Box
unit price:Negotiable
| Dredger LOA | 34.0m |
| Hull size (LxBxH) | 23.0x7.5x2.5m |
| Main pontoon (LxBxH) | 13.8x3.5x2.5m |
| Side pontoon (LxBxH) | 22.0x2.0x2.5m |
| Structure | delivery cost |
| Main engine brand/power | Cummins/596kW |
| Auxiliary engine brand/power | Cummins/224kW |
| Harbour generator | Cummins/30kW |
| Total power | 820kW |
| Dredging pump | Warman Technology |
| Discharge pipe innerdiameter | 450mm |
| Head | 48m |
| Max dredging depth | 14m |
| Water flow | 3000m/h |
| Solid sand capacity | 600m/h |
| Discharge distance | 1500m |
| Cutter head diameter | 1500mm |
| Cutter power | 80kW |
| Draught | 1.7m |
| Displacement | 224T |
| Hydraulic control system | PLC Siemens |
| Wire rope pulling force (Lifting winch )*Quantity | 80KN *1 |
| Wire rope pulling force (Traversing winch )*Quantity | 80KN *2 |
| Operation room | adjustable chair, movable side-window, air condition, PLC system, signal lights and floodlights |
| Total weight | 130T |
| Total fuel oil consumption | 123L/H |