Negotiable
The date of payment from buyers deliver within days
Shaanxi
Long-term effective
2017-11-12 03:13
125
Company Profile
By certification [File Integrity]
Contact: ruijie(Mr.)
Email:
Telephone:
Phone:
Area: Shaanxi
address: Rm 10802,Block B,Kairui Building,Xi'an Economic Development Zone,China.
Website: http://www.rejeedrilling.com/ http://ruijie.gztaixiangzghy.com/
Formwork Wall- through Bolt
unit price:Negotiable
Formwork Pin and Clip set
unit price:Negotiable
Pipe and Coupler Shoring
unit price:Negotiable
Steel Waling system
unit price:Negotiable
Formwork Tie Rod
unit price:Negotiable
Hook Square Pipe Connection Waler Clamp
unit price:Negotiable
HQY-500 Full Hydraulic Module Light Core Drilling Rig
Application
The HQY-500 Full Hydraulic Module Light Core Drilling Rig adopts division structure of executable section and control section of power, which could be used in all kinds of construction areas, such as tunnels, mountains, highlands and so on. The light core drilling machine has functions that can strengthen the ability for catering to the various kinds of construction environment, shortening the construction period, reducing the work intensity, and so on.
Features1.adopts division structure of executable section and control section of power.
2.Weight of each parts:no more than 200kg, Light Weight easy to move.
Technical Data
Drilling Depth |
500m |
||||
Drilling angle range |
45°-90° |
||||
The Distribution of Rotating Speed |
0-1000r/min |
||||
The Output Torque |
0-2080N•M |
||||
Max feeding force |
60KN |
||||
Max pulling force |
125KN |
||||
Power |
CZ480Q*3diesels, 26kw/2500r/min for each |
||||
Feed cylinder stroke |
1800mm |
||||
Weight |
≤180kg for each separated components |
||||
Working Pressure of the Driller |
20MPa |
||||
The Windlass | |||||
|
Hydraulic winch Ⅰ (used for rope core) |
Pull Force (kg) |
1500 |
1470 |
1325 |
1025 |
Linear velocity |
34 m/min |
36 m/min |
39 m/min |
50 m/min |
|
Rope capacity |
49m |
99m |
151m |
500m |
|
Motor displacement |
115ml/r |
||||
Lifting pressure |
18MPa |
||||
Brake opening pressure |
1.5-3MPa |
||||
Rope diameter |
Ø6mm |
||||
|
Hydraulic winch Ⅱ (used for pulling the drill) |
Rated pull force of rope |
68KN |
|||
Working speed |
7.5m/min |
||||
Rope capacity |
45m |
||||
Rope diameter |
Ø14mm |
||||
pressure |
14MPa |
||||
Hydraulic pump | |||||
Model |
YZ4-150 direct&nb |
||||